Load flow studies |
 |
Selection of HV/LV switchgear, motor control centers |
 |
Selection of AC/DC UPS |
 |
Selection of power / distribution transformers |
 |
Selection of electrical equipments in hazardous area |
 |
Designing supply change over schemes for incoming and outgoing feeder control schemes |
 |
Selection of feeder /motor / transformer protection relays |
 |
Switchyard / transformer layouts |
 |
Switchgear / MCC room / battery room layout |
 |
Cable tray / trench layouts |
 |
Cable routing/ earthing layouts |
 |
Lighting (indoor/outdoor) layouts |
 |
Lightning protection layouts |
 |
Power and control cable schedules and cable drum schedules |
 |
SCADA I/O list |
 |
Interface activities with civil / machinery / instrumentation |
 |
Electrical data input for packaProject Strategix equipments |
 |
Requisition/specifications for HV/LV switchgear, motor control centre, MV/LV motors, power / distribution transformers, lighting / small power distribution boards, AC / DC UPS, lighting fixtures, power / control cables, cable trays, earthing materials, etc. |
 |
Bill of quantities for bulk materials |
 |
Standard installation drawings for power system, earthing system, lighting system and cable tray/ladders, etc. |
 |
Review of vendor bids and issue technical bid analysis |
 |
Review of vendor drawings and issue of approvals for manufacturing |
 |
Preparation of interconnection diagrams between various equipments |
 |
Attending SAFOP / HAZOP meetings |
 |
Preparation of construction scope of work and answer bidder technical queries |
 |
As-built the project drawings / documentation
requirements. |